AIA DOCUMENT G704™–2017 EQUIVALENT•PUNCH LIST & WARRANTY TRIGGER
Certificate of Substantial Completion Generator
Establish the legal Date of Substantial Completion, freeze liquidated damages, trigger warranty commencement, transfer building occupancy responsibilities, and schedule retainage releases.
Punch List Total$0.00
Retainage Release$0.00
Project & Contract Information
Project Stakeholders & Parties
Architect / Engineer of Record:
General Contractor Prime:
Owner / Project Sponsor:
Retainage & Financial Closeout
$
%
%
Total Retainage Withheld (10%):$1,485,000.00
Retained Post-Substantial (2.5%):$371,250.00
Net Retainage Released to GC:$1,113,750.00
Inspection Punch List Items
Transfer of Building Responsibilities
AIA G704 Live Legal Sheet
Certificate of Substantial Completion
AIA Document G704™ – 2017 Standard Form
CERTIFICATE NO: G704-001
DATE: September 23, 2026
PROJECT:
Vanderbilt Innovation & Medical Tech Center
2100 West End Ave, Nashville, TN 37203
CONTRACT NO: CON-2025-084B
CONTRACT DATE: March 15, 2025
ARCHITECT / ENGINEER:
Gresham Smith Architecture
David Sterling, AIA
CONTRACTOR:
Granbridge Commercial Builders LLC
John Granbridge, Principal
OWNER:
Vanderbilt Health Real Estate Trust
Marcus Vance, VP Development
Scope of Work Substantially Completed:
The Work to which this Certificate applies has been inspected by authorized representatives of the Architect and Contractor, and the entire Work under Contract is hereby declared to be Substantially Complete.
Declaration & Legal Establishment of Date
The Date of Substantial Completion of the Work or designated portion thereof is the date certified by the Architect when construction is sufficiently complete, in accordance with the Contract Documents, so that the Owner can occupy or utilize the Work for its intended use.
CERTIFIED DATE OF SUBSTANTIAL COMPLETION:September 20, 2026
List of Items to be Completed or Corrected (Punch List)
Completion Window: 30 Days
A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. The Contractor will complete or correct the Work on the list of items within the agreed completion window.
Item #
Description of Work to Correct
Location
Trade Sub
Est. Cost
Total Estimated Punch List Value:
$0.00
Warranties Commencement:
One-year General Contractor warranty and manufacturer equipment warranties commence on the Date of Substantial Completion.
Transfer of Security, Heat & Utilities:
Owner assumes responsibility for building security, HVAC operation, utility consumption, and permanent property insurance as of 12:01 AM on the Date of Substantial Completion.
Retainage Reduction Certificate:
Current Contract Sum to Date: $14,850,000.00Retainage Reduced to: 2.5%Retainage Release Recommended: $1,113,750.00